Micr’Eau has just won a prize of nearly 300,000 euros for the studies, supply and installation supervision of 3 Sattler brand gasometers on behalf of Coarco , holder of the construction contract of the main sewage treatment plant in the Argentine capital (population equivalent of 1 million). This project, funded by the World Bank and operated by AYSA, Latin America’s largest water and sanitation authority, will be an undeniable showcase of Micr’Eau’s biogas know-how once the installation is complete (scheduled for the end of April 2021).
Assembly of 2 gasometers for Veolia in Ariège
Micr’Eau has completed the installation of 2 Sattler DMGSTM gasometers installed on digesters designed by Veolia in Ariège, Montaut.
This project signed in April 2020 was carried out in less than 6 months despite the sanitary crisis
Fasep project in Chile for arsenated waste in the Antofagasta region
Micr’Eau wins a 600,000 euro call for projects as part of the Fasep launched by dg Trésor. It includes the establishment of two potabilisation stations (arsenic adsorption filtration) and a reprocessing unit for arsenated waste located in the Baqudano area near the mining sites; This project represents 400 engineer days and will be carried out jointly by Micreau and its subsidiary AEC in Chile. The beneficiary AMRA (association of municipalities of the Antofagasta region, 700,000 people) will bring its know-how in infrastructure management to accompany Micr’Eau in its planned completion over 2021 (12 months)
Micr’Eau is entrusted with the provision of filter media for the treatment of arsenic by SAUR
5 .5 Tons of media made in Germany specifically for the SAUR group which manages one of the largest parks of water treatment plants eliminating arsenic.
Here is the new challenge of Micr’Eau, which for the sixth time in recent years supplies saUR with filter media throughout the French territory as:
- Eastern France
- Sologne
- Center (Creuse)
Micr’Eau is the only company authorized in France to distribute these media filters approved in France for water ability and arsenic treatment, as well as other contaminants such as selenium and antimony.
Micr’Eau wins the tender for the maintenance of the 5 flares at the Achères site operated by SIAAP
As part of a tender launched this spring, Micr’Eau was awarded Lot 2 (spare parts) for the maintenance of 5 Torchères operated by SIAAP (3-3500Nm3/h and 2-2000Nm3/h) as part of the production of biogas from the methanization of the sludge.
This tender won for 4 years confirms the logic of our company to deploy in the supply, installation and monitoring of flares after the gain of 6 new flares of 3600 Nm3/h awarded by the Suez group in 2019 to the Hofstetter-Micreau group for its Biogas sector on the same site. Achères is as a reminder the largest sewage treatment plant in Europe (8 Million Equivalent Inhabitants)