+33 (0)6 14 31 24 49

Micreau and its construction teams have achieved the feat of mounting in less than a week two major equipment for the future station of Bonneuil in France (SIAAH- 500,000 Eq Habitants):
– A 1500m3 Sattler brand biogas stocker (Germany)
– A 600 Nm3/h Hofstetter capacity flare (Holland)
These two imposing equipments: torch 7m high and gasometer 10m high, will allow the biogas line designed by OTV to ensure storage and security of the process.
The combined amount of this transaction represents an investment of more than 160,000 euros HT.