+33 (0)6 14 31 24 49

First Micr’Eau project with the SAUR group on its biomethanisation line in Montauban to equip the biogas storage digesters. An acrobatic project, since the equipment will be located more than 10 metres high and will cover two structures 16 metres in diameter. We’ll be back next month when the work is completed.