+33 (0)6 14 31 24 49
Series of biogas modernization and after-sales contracts in France and Chile

Series of biogas modernization and after-sales contracts in France and Chile

Micr’Eau and its Chilean subsidiaries AEC and ABM are carrying out several biogas projects at the end of 2022 with its loyal customers Urbaser (European leader in the treatment of household waste by methanization), Veolia Haut de France, Tereos (world leader in sugar), Aguas Andinas (Veolia Water)

These operations concern the complete renovation of gasometers, flares or after-sales service and expertise contracts at the request of its Franco-Chilean customers.

The Micr’Eau group thus confirms its expertise in the value chain of the production and operation of the biogas sector and can therefore strengthen its qualified technicians and engineers in our engineering, maintenance and operation of biomethane units. Above Trebal/Mapocho site (Santiago de Chile: WWTP of 4 million inhabitants operated by the Veolia group)

Micr’Eau deploys in the segment of gas holders and flares in the industrial sector

Micr’Eau deploys in the segment of gas holders and flares in the industrial sector

Our company has just won several contracts in the field of biogas this summer with industrialists in France. To name a few:

  • Pronal (compact gasometer in container for an industrial sector resulting from R&D)
  • Smurfit Kappa (dismantling of an Easter storer, followed by a mobile unit and a gasometer in container)
  • Tereos (design and supply of a flare for a sugar site located in the Hauts de France)
Unité mobile biogaz Sattler
Micreau completes the renovation of the 5000m3 gasometer for GRT GAZ in Alfortville

Micreau completes the renovation of the 5000m3 gasometer for GRT GAZ in Alfortville

Our company dismantled and rebuilt in record time (less than a month) one of the largest gasometers in France: a 5000m3 gas storer for the RICE research center of the GRT GAZ group from Gaz de France. This work mobilized half a dozen people from our company for a period of a fortnight and consisted of dismantling the old 17-year-old gasometer and re-installing a new Sattler brand gasometer. The gasometer rehabilitation market is one of our strong points because it requires many engineering, works and maintenance skills developed in our company for nearly 20 years, especially on the Sattler range.
Travaux de rénovation du gazomètre de GRT Gaz à Alfortville
A 5000m3 turnkey gasometer project for GRT Gas

A 5000m3 turnkey gasometer project for GRT Gas

Micr’Eau wins a turnkey project for a 5000m3 gasometer for the GRT Gas test centre in Alfortville.
This project is scheduled to be installed by June 2021. It will use the strongest membranes on the type 4 and 5 market manufactured by our partner Sattler.